PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing black iron ductwork at the 4th Floor Facing South-East.jpg Continued installing curtain wall mullions at the Monumental Stair Facing South 1.jpg Continued installing curtain wall mullions at the Monumental Stair Facing South 2.jpg Installing copper piping at the 3rd floor Facing North.jpg Installing sprinkler branches at the 4th floor Facing West.jpg Installing waste and vent piping at the 3rd floor bathrooms Facing North.jpg Continued roof installing at the high roof Facing East 1.jpg Continued roof installing at the high roof Facing South.jpg Installing metal decking at Stair -3 Facing North.jpg
Previous pageNext page Installing sprinkler branches at the 4th floor Facing West
Installing sprinkler branches at the 4th floor Facing West